, back to

Political Factoid

The primary reason for structural
bridge deficiencies is political
inaction and hypocrisy.
 
The secondary cause is contractor shortcuts
and political payoffs during original construction.
-30-

Collected by students of  Zo^o University
Last updated * 2016-07-27
Copyright © 2015-2016 Zo^o University
All Rights Reserved